Project Information

Client:
Wimbledon Almshouse
Sector:
Charity/Residential
Duration:
4 Weeks
Services:
Replacement of aging plant equipment

Temperature Control & Energy Saving

Replacement plant was comprised of Vaillant Ecotec boilers, heat exchanger, twin heating circulating pump set, a new gas installation and associated pipework, fully insulated pipework and weather compensating heating controls.

To ensure the residential flats gained benefits from the upgrades, 111 replacement radiator valves and thermostatic sensor heads were installed to enable residents to have better temperature control and energy saving.

Back to Projects
back
to top