Gratte Brothers was appointed Principal Contractor by Ark Data Centres to undertake the M&E services infrastructure fit out of their new 16MW data centre within an existing live building, the first phase of a multi-phase project at the Meridian Park site.
The mechanical and electrical services were designed and installed across 2 floors and included multi-voltage (MV) infrastructure, MV generators, low voltage (LV) transformers and switchgear, uninterrupted power supplies (UPS) and data hall cooling units.
These services were in addition to busbar, lighting and power, fire alarms, gas suppression, building management systems (BMS), domestic water services and drainage.